Knitted Angora Pullover with V-Neck and Round Yoke
Winter is not far off, so we keep on getting warmer.
I am starting yet another warm, cozy fluffy piece. This will be a pullover with a V-neck on a round yoke.
I will knit with two strands held together, using these yarns:
– Angora 60%, 700 m/100 g;
– Angora 60% with micro sequins, 650 m/100 g.
For the 1×1 rib I will use a special extra strand.
Needles: 3.5 mm and 4 mm.
Pullover size: 48–50.
For a shallow neckline I cast on 120 stitches on 3.5 mm needles (two strands of angora + the extra strand).
I mark the 61st stitch from the start of the row. This is a knit stitch, the center stitch of the front.
We start knitting the neckline in 1×1 rib (rows 1–17).
On every second row we make increases beside the center front stitch (on both sides).
Increase rows: 2, 4, 6, 8, 10, 12, 14, 16. In total we increased 16 stitches.
There are 120+16=136 stitches on the needles.
Cut the extra strand, change to 4 mm needles and start the round yoke from row 18 (see the video, part 1).
Row 18 – knit.
Row 19 – knit, evenly increasing 27 stitches across the row.
There are 136+27=163 stitches on the needles.
Rows 20–21 – knit.
Row 22 – openwork band (hemstitch).
Rows 23–24 – knit.
Row 25 – knit, evenly increasing 28 stitches across the row.
There are 163+28=191 stitches on the needles.
Rows 26–27 – knit.
Row 28 – openwork band (hemstitch).
Rows 29–30 – knit.
See the rest of the knitting process in the video, part 2.
Row 31 – knit, evenly increasing 28 stitches across the row.
There are 191+28= 219 stitches on the needles.
Row 32 – bobble pattern: 1 bobble, 7 knit.
In this row I added one stitch to keep the pattern symmetrical: 219+1=220 stitches.
Row 33 – knit.
Rows 34–36 – lace pattern no. 21 from the magazine “280 Lace Patterns”, chart in the gallery below.
Row 37 – knit.
Next, watch the video, part 3.
Row 38 – knit, evenly increasing 24 stitches across the row.
There are 220+24= 244 stitches on the needles.
Row 39 – knit.
Rows 40–42 – lace pattern no. 21 from the magazine “280 Lace Patterns”, chart in the gallery below.
Row 43 – knit.
Row 44 – knit, evenly increasing 24 stitches across the row.
There are 244+24= 268 stitches on the needles.
Row 45 – knit.
Rows 46–48 – lace pattern no. 21 from the magazine “280 Lace Patterns”, chart in the gallery below.
Row 49 – knit.
Row 50 – bobble pattern: 1 bobble, 7 knit.
Row 51 – knit.
Row 52 – knit, evenly increasing 25 stitches across the row.
There are 268+25= 293 stitches on the needles.
Row 53 – knit.
Row 54 – openwork band (hemstitch).
Rows 55, 56 – knit.
The yoke is done. Now we divide all the stitches into the front, the back and two sleeves. The sleeve stitches go onto waste yarn. Over the back stitches we work an Asian-style back raise in short rows: rows 57 (RS) to 68 (WS).
After the back raise we cast on stitches for the undercuts (10 stitches on each side) and begin the main body in shortened short rows.
We bring the front stitches into the work gradually. Divide the front stitches into 5 groups and mark them with markers:
- 1 group of 15 stitches,
- 4 groups of 10 stitches.
We make 4 turning points on each side of the front. This evens out the front and back sections, and we continue the main body in the round to the length we need. After the stockinette we change to 1×1 rib, adding the extra strand to stabilize the fabric. We keep the same needle size.
Work 18 rows of 1×1 rib. Then 2 rows of tubular rib. After that we bind off with a tapestry needle.
The main body is finished, and we move on to the sleeves.
On the waste yarn (the cord) there are 45 stitches for each sleeve. Along the edge of the back raise and the undercut I pick up 27 more. So each sleeve has 45+27=72 stitches. We work in the round in stockinette to the length we need.
Then we work the bobble pattern and three pattern repeats in height of the lace pattern, as on the yoke. Then 6 more rows of stockinette.
After that we move on to the cuffs in 1×1 rib, adding the extra strand for stability. We keep the same needle size. Work 18 rows of 1×1 rib, then 2 rows of tubular rib. In the next row we bind off with a tapestry needle.
The pullover turned out soft, warm, pleasantly fluffy and very cozy.
Size: 48–50.
Finished length: 65 cm.
Yarn used: 360 g, including 60 g of Angora 60 with micro sequins.
You may also like
Crochet Doily “Morning Dew”: Fabric and Lace Combined
July 1, 2025
Crochet Jumper “Cleopatra” Worked Top-Down
February 9, 2020
















































